Lining of eight different sized pools.

The lining layers included:

  1. Geotextile to protect the lining system from mechanical damage.
  2. Gas drainage mats.
  3. 1.5 mm thickness H.D.P.E Geomembranes manufactured by Ginegar Plastic Products Ltd.

 

The lining works included connection to concrete facilities and they were conducted in parallel to the earthworks performed by the operating contractor.
The work was carried out within a particularly dense schedule and was completed on time to the client’s satisfaction.